Oracle Primavera P6 training.
24 hands-on hours covering the tool the way project controls teams actually use it — baselines, updates, EVM, resource loading, delay analysis, and the schedule-evidence pack that supports EOT claims under FIDIC.
The industry standard for capital-project scheduling.
Primavera P6 is the tool the EPC industry expects — on oil & gas, infrastructure, power and mining projects worldwide. Its multi-project resource pool, baseline management (up to 50 baselines per project) and audit defensibility are why it dominates delay-analysis and claims work.
- Publisher: Oracle
- Standard on: EPC, oil & gas, infrastructure, mining, defence, aerospace
- Core strengths: multi-project resource pool, robust baseline management, complex WBS handling, audit defensibility on claims
- Versions: P6 Professional (client-server, primary) and P6 EPPM (web)
Built for the team that owns the schedule.
Planning Engineers
The core audience. Learn the tool the way an EPC or infrastructure planner uses it — not through a textbook lens.
Project Controls
Cost + schedule + risk integrated. EVM, contingency management, forecasting.
Quantity Surveyors
Use the schedule as claim evidence — how baselines, updates and fragnets support cost claims.
Project Managers
Read what your planners produce; ask the right questions; commission defensible schedule evidence.
EPC Contract Engineers
Bridge FIDIC obligations to schedule evidence — particularly on Red, Yellow and Silver Book projects.
Civil & Mechanical Engineers
Moving into planning or controls from a delivery background — this is your entry point.
Every module ends in a schedule artefact.
P6 fundamentals
EPS, OBS, WBS, activity types, calendars, relationships. First lab: build a small project baseline from scratch.
Scheduling & critical path
Forward & backward pass, total float vs free float, constraints, F9 scheduling, near-critical activities.
Resource & cost loading
Resource pools, cost accounts, price/unit, resource curves, resource-leveling strategies.
Baselines & progress updates
Baseline capture, data dates, retained-logic vs progress-override, actualised durations, update discipline.
EVM, S-curves & reporting
CPI, SPI, EAC, cost + physical-progress S-curves, layouts, filters, portfolio-level rollup.
Delay analysis + EOT
Modelling delay events as fragnets, Time Impact Analysis, Windows Analysis, Collapsed As-Built, schedule-evidence pack for FIDIC claims.
Choose a format that fits your project.
For currently confirmed batch dates, WhatsApp us.
Transparent pricing.
Standard — ₹22,000 + GST
- 24 hands-on live hours
- All session recordings for 60 days
- Real-project P6 exercise files
- Cohort WhatsApp channel
- Certificate of Completion
Corporate — on request
- On-site or hybrid delivery
- Custom curriculum using your own project files
- NDA-covered case studies
- Post-training project-controls audit
Every P6 skill has its own page.
The pillar page below ties the disciplines together; each skill page goes deep on one topic.
Primavera P6 & Project Controls →
The full project-controls picture — scheduling, EVM, S-curves, delays, EOT.
Primavera P6 WBS →
The Work Breakdown Structure that everything hangs off.
Primavera P6 Critical Path →
Forward/backward pass, float, near-critical activities.
Primavera P6 Baseline →
Capture, compare, and control against baselines.
Primavera P6 S-Curve →
Cost and physical-progress cumulative curves.
Primavera P6 Delay Analysis →
TIA, Windows Analysis, Collapsed As-Built.
Primavera P6 for EOT Claims →
Schedule-evidence packs for Extension of Time submissions.
Common questions.
Ready to learn Primavera P6?
Fifteen-minute call. Tell us your project background and target start date — we'll recommend the batch and format that fit.