Master Oracle Primavera P6 — The Tool Behind Every Major EPC Program
Used by ONGC, Aramco, Bechtel, Larsen & Toubro, and most major EPC capital programs worldwide. Learn from a planner who has actually deployed P6 across 12+ countries — not from someone who only learned it in a classroom.
Why Primavera P6 is Non-Negotiable in EPC
If you're a planner, scheduler, or PMO member in EPC, Oil & Gas, Power, or Infrastructure — knowing P6 isn't a "nice to have." It's the entry ticket.
EPC Industry Standard
Mandatory for tenders with ONGC, IOCL, BPCL, NTPC, Adani, Reliance, Aramco, ADNOC, Bechtel, L&T, Tata Projects, Afcons.
Multi-Project Power
Handles 100,000+ activities across portfolios. Resource leveling, EVM, baseline tracking — at program scale, not just project scale.
High Pay Premium
Certified P6 planners typically earn an industry premium over generic schedulers, reflecting their specialized skill.
Global Mobility
Recognized worldwide. P6 expertise opens doors to projects in Middle East, Africa, Australia, and SE Asia — typically at 2-3× Indian salaries.
EOT & Claims Edge
P6 baseline + variance reports are the backbone of EOT claims under FIDIC, NEC, and Indian contracts. Critical for disputes worth crores.
Fast Career Lift
Many learners report a role upgrade — Junior Planner → Sr. Planner / PMO Lead / Project Controls Manager.
Trained by an Actual P6 Practitioner
Most P6 trainers in India teach from a manual. Ours has personally deployed P6 on billion-dollar EPC programs across 12+ countries.
Real Implementations, Not Theory
Gyanendra has implemented Primavera P6 and Oracle Unifier on real EPC programs at ONGC, IOCL, BP-Castrol, NHPC, and Qatar Petroleum. He doesn't teach what's in the manual — he teaches what actually works.
- ◆ ONGC Offshore programs
- ◆ IOCL Panipat Refinery programs
- ◆ BP-Castrol India programs
- ◆ NHPC Bhutan Hydropower
- ◆ Qatar Petroleum maintenance
- ◆ EPS / OBS / WBS architecture
- ◆ Resource & cost loading
- ◆ Earned Value Management
- ◆ Baseline & variance reporting
- ◆ EOT claim schedule analysis
8 Modules · 24 Hours Hands-On
From Day 1 you'll be inside Primavera P6 building real EPC schedules. By Day 8, you'll be running EVM analyses on a live multi-project portfolio.
• Database structure: EPS (Enterprise Project Structure), OBS (Org Breakdown), Resource Pool
• User roles, security profiles, permissions
• Project codes, resource codes, activity codes
• Calendars: global, project, resource (multi-shift, holiday)
• Lab: Set up an EPC project structure for a sample refinery program
• Activity types: Task Dependent, Resource Dependent, Level of Effort, Milestone
• Activity codes for filtering and reporting
• Constraint types — when to use Must Finish By, Start On, etc.
• Notebook topics, steps, expense items
• Lab: Build a 200-activity refinery shutdown WBS
• Lag and lead — and the dangers of negative lag
• Critical path method (CPM) deep-dive
• Total Float vs Free Float — what auditors look for
• Driving relationships and progress overrides
• Lab: Build network logic for a piping installation sequence
• Resource calendars and unit/time
• Cost accounts hierarchy
• Loading: manual vs price/unit, expense vs resource
• Resource leveling — automatic vs manual
• Lab: Resource-load a structural steel erection program
• Original Baseline (BL0) vs Revised Baseline (BL1, BL2)
• Status updating: % Complete, Remaining Duration, Actual Start/Finish
• Progress override vs retained logic
• Update procedures for time-now-driven schedules
• Lab: Update a 500-activity schedule for a monthly progress cycle
• CPI, SPI, EAC, ETC, TCPI calculation methods
• Performance % Complete techniques: Duration, Units, Physical, 0/100, 50/50
• Cost variance vs schedule variance reporting
• EAC forecasting techniques
• Lab: Build a complete EVM dashboard for executive reporting
• Schedule comparison reports (BL vs Current)
• Critical path & near-critical reports
• Custom reports via Report Wizard
• Exporting to MS Project, Excel, XML, XER
• P6 dashboards for executives
• Lab: Build 5 standard EPC client reports
• Time Impact Analysis (TIA) for delay claims
• Windows analysis methodology
• Multi-project scheduling and resource sharing
• Schedule audits — what consultants look for
• Final lab: Build a complete EOT analysis for a delayed milestone
Complete Primavera P6 Mastery Package
Hands-on labs from session 1. Real EPC datasets. Direct trainer access. Take-home templates you'll use in your actual job.
- ✓ 24 hours hands-on lab time
- ✓ P6 Professional v22 license access
- ✓ Real EPC datasets (refinery, power, infra)
- ✓ Recorded sessions (180 days)
- ✓ Direct trainer WhatsApp support
- ✓ EPC WBS templates (refinery, EPC, hydro)
- ✓ Activity code library setup files
- ✓ Custom layouts for client reporting
- ✓ EVM dashboard templates
- ✓ Schedule audit checklists
- ✓ Resume review for P6 roles
- ✓ Interview question bank (200+ Qs)
- ✓ Sample case studies for tests
- ✓ Job board access (alumni network)
- ✓ LinkedIn profile optimization
- ✓ 24 PDU certificate of completion
- ✓ Counts toward PMP/PgMP renewal
- ✓ Verifiable digital badge
- ✓ Optional Oracle exam coaching
- ✓ Lifetime alumni network access
- 24 Hours Hands-On Training
- P6 v22 Software Access
- Real EPC Project Datasets
- 180-Day Recorded Access
- Take-Home Template Kit
- 1:1 Direct Trainer Support
- 24 PDU Certificate
- Resume + Interview Prep
- Alumni Job Board Access
Salaries that P6 Unlocks
Roles You'll Unlock
P6 expertise is the fastest way to break into senior project controls roles. Below are typical roles our P6 alumni land within 6 months.